Planning a paver patio, walkway or driveway? Enter the area, pick a paver size and layout, and get the number of pavers to buy, the gravel for the base, the bedding sand and a cost estimate. It covers US sizes from 4 × 8″ brick pavers to 24 × 24″ slabs and metric sizes from 200 × 100 mm to 500 × 500 mm, with waste for running bond, diagonal and herringbone layouts.

ft
ft
in

4″ (100 mm) for patios and walkways, 6–8″ (150–200 mm) for driveways.

$/sq ft
$

Your estimate

Pavers needed
673 pavers
Estimated total cost
$1,473.50
Paved area
240 sq ft
Pavers per unit area
28.73 per sq ft
Gravel base to order
4.74 tons
Bedding sand (1″ / 25 mm)
0.98 tons
Paver cost
$1,260.00
Base cost
$213.50

Paver counts use the nominal face size; joint width is covered by the waste allowance.

Add a 50 lb (23 kg) bag of polymeric joint sand per 50–75 sq ft (5–7 m²) of tight-jointed pavers, plus edge restraints on every open side.

Compact the gravel base in 2–3″ (50–75 mm) lifts. Road base / crusher run at ≈1.6 t/yd³ (1,900 kg/m³) is assumed.

How to use this calculator

  1. Measure the length and width of the area in feet or meters. For odd shapes, split the job into rectangles and add the runs together.
  2. Choose your paver size. The label shows how many pavers cover a square foot or square meter.
  3. Pick the layout. Running bond wastes about 5%, a 45° diagonal about 10% and herringbone about 15% in cuts at the edges.
  4. Set the gravel base depth: 4″ (100 mm) for patios and walkways, 6–8″ (150–200 mm) for driveways.
  5. Enter local prices for pavers and gravel to see the total material cost.

How the paver calculation works

The area is divided by the face of one paver, then increased by the layout waste. A 20 × 12 ft patio is 240 sq ft, and a 6 × 9″ paver covers 0.375 sq ft, so the job needs 640 pavers, or 673 with the 5% running-bond allowance. The same patio in herringbone (+15%) takes 737.

Under the pavers goes a compacted gravel base and a 1″ bed of sand. For 240 sq ft at 4″ deep, the base is 80 cu ft (about 2.27 m³) of road base, which weighs roughly 4.7 tons. The 1″ sand bed is another 20 cu ft, about 1 ton. Compact the gravel in 2–3″ lifts or it will settle and take the pavers with it.

At $5 per sq ft for pavers and $45 per ton for road base, this patio's materials come to about $1,260 for pavers and $213 for the base — roughly $1,473 all in, before polymeric joint sand, edge restraints and any drainage.

In metric, a 6 × 4 m patio with 200 × 100 mm pavers (50 per m²) needs 1,200 pavers, or 1,260 with 5% waste. A 100 mm base takes 2.4 m³, about 4.6 tonnes, of crushed stone, plus about 1 tonne of bedding sand.

Pro tips

  • Slope the finished surface away from the house at about ¼″ per foot (2%), and shape the base to the same slope before you screed the sand.
  • Screed the bedding sand with two 1″ pipes and a straight board, and don't compact the sand before laying — the plate compactor beds the pavers into it afterwards.
  • Install edge restraints on every open side before compacting. Unrestrained edges creep outward within a season.
  • Order pavers from a single production run and mix bundles from several pallets as you lay, so any color variation spreads evenly.
  • Keep 10–15 spare pavers after the job. They weather with the patio, and matching a discontinued color later is nearly impossible.

Frequently asked questions

How many pavers do I need per square foot?

It depends on the paver face: 4 × 8″ brick pavers take 4.5 per sq ft, 6 × 6″ take 4, 6 × 9″ take 2.67, 12 × 12″ take exactly 1, and 16 × 16″ take 0.56. Metric 200 × 100 mm pavers take 50 per m² and 400 × 400 mm slabs take 6.25 per m².

How many pavers for a 12 × 12 patio?

A 12 × 12 ft patio is 144 sq ft. With 4 × 8″ pavers and running bond that's 679 pavers; with 6 × 9″ pavers it's 404; with 12 × 12″ slabs it's 152. Add another 10% for a diagonal layout or 15% for herringbone.

How deep should the base be for a paver patio?

4″ (100 mm) of compacted gravel for patios and walkways, and 6–8″ (150–200 mm) for driveways, on top of the native soil. A 240 sq ft patio at 4″ takes about 4.7 tons of road base; a driveway at 6″ takes about 7 tons.

How much sand do I need under pavers?

A 1″ (25 mm) bedding course, which is about 1 ton of sand per 240 sq ft (1 tonne per 40 m²). That's bedding sand only — polymeric joint sand for the gaps is separate, about one 50 lb bag per 50–75 sq ft.

How much extra should I order for herringbone?

15% over the net area. Every paver that meets an edge is cut at 45°, and a 240 sq ft patio in 6 × 9″ pavers goes from 640 pieces to 737. Straight running bond needs only 5%.

Can I lay pavers on just sand or dirt?

No. Bare soil moves with moisture and frost, and sand alone washes out. Skipping the compacted gravel base is the main reason paver patios develop waves and trip edges within a couple of years.

These results are estimates for planning and budgeting. Actual quantities depend on site conditions, products and workmanship. Check structural and code requirements with a licensed professional before you build.