How to use this calculator
- Choose your masonry unit: brick type or 8 × 8 × 16 concrete block.
- Enter how many you're laying. Bricks are usually ordered by the thousand.
- Keep the standard joint — ⅜″ in the US, 10 mm in the UK — or set your own.
- Pick your premix bag size, or read the cement-and-sand line if you mix your own.
- Enter the bag price for the total cost.
How the mortar calculation works
Mortar fills the gaps between units: the volume of the finished wall minus the volume of the units themselves, increased to cover filled frogs and cores, furrowing and droppings. For 1,000 US modular bricks with ⅜″ joints that comes to about 15 cu ft (0.43 m³) of wet mortar.
Divide by the bag yield — 0.67 cu ft for an 80 lb bag — and 1,000 modular bricks need **23 bags of 80 lb premix**, or 31 bags of 60 lb. That's about 43 bricks per bag. UK standard bricks with 10 mm joints take about 42 bags of 25 kg per 1,000.
For 8 × 8 × 16 concrete blocks laid on face-shell beds, the same math gives about 5.2 cu ft per 100 blocks: 8–9 bags of 80 lb premix per 100 blocks.
Site mixing is cheaper past a couple of thousand bricks: one 70 lb bag of masonry cement with 3 cu ft of damp sand makes about 3 cu ft of mortar, so 1,000 bricks take 6 bags of cement and roughly half a cubic yard of sand.
Pro tips
- Match the mortar type to the job: Type N for above-grade walls and veneer, Type S below grade and for retaining walls. See the bag label.
- Mortar stays workable for about two hours. Mix half batches on hot days and never add water to stiffened mortar — re-tempering destroys strength.
- Keep joints consistent. A ½″ joint instead of ⅜″ uses about a third more mortar and looks worse.
- Damp (not soaked) sand gives the most workable mix; bone-dry sand flashes the water out of the cement before it cures.
- Store bags off the ground on a pallet. Hardened lumps in a bag mean the cement has already started to hydrate — don't use it.
Frequently asked questions
How many bags of mortar do I need for 1,000 bricks?
About 23 bags of 80 lb premix (or 31 of 60 lb) for 1,000 US modular bricks with ⅜″ joints — roughly 15 cu ft of mortar. Mixing your own takes about 6 bags of 70 lb masonry cement plus half a cubic yard of sand.
How many bricks does one bag of mortar lay?
About 43 modular bricks per 80 lb bag with ⅜″ joints. Queen bricks run higher (about 50 per bag) because they're thinner; thick utility bricks lower.
How much mortar for 100 concrete blocks?
About 8–9 bags of 80 lb premix per 100 standard 8 × 8 × 16 blocks laid on face-shell mortar beds — roughly 5.2 cu ft. Solid blocks need more because the whole bed is mortared.
What is the mix ratio for site-mixed mortar?
Type N: 1 part masonry cement to about 3 cu ft of damp sand per 70 lb bag, which is the common 1:3 field mix (the formal spec is 1:1:6 cement:lime:sand). Type S bumps the cement up. Premix bags already have the ratio right.
How much does mortar cost per 1,000 bricks?
About $210 in 80 lb premix bags at $9 each for 1,000 modular bricks. Site-mixed with masonry cement and sand, the same wall costs roughly $60–80 in materials.
How long is mortar workable after mixing?
About 2 hours at moderate temperatures, less in heat. Once it stiffens, throw it out — adding water (re-tempering) restores workability but cuts the final strength.
These results are estimates for planning and budgeting. Actual quantities depend on site conditions, products and workmanship. Check structural and code requirements with a licensed professional before you build.